Skip to content
(650) 850-5881
Call (650) 850-5881

· 5 min read · By Egret Clean Team

Post-Construction Cleaning Cost in the Bay Area

How post-construction cleaning is priced in the Bay Area: per square foot by phase, starting rates, worked examples and what changes a bid.

Tape measure and floor plan on a step stool in an empty remodeled living room, measuring square footage for a post-construction cleaning bid

Post-construction cleaning is usually priced per square foot, by phase. In the Bay Area our rates start from $0.12 per square foot for a commercial rough clean and from $0.55 per square foot for all three phases on a residential project. The final number depends on debris, finishes, glass and access, so every project gets a written bid.

This post explains how that pricing works, gives worked examples, and lists what moves a bid up or down. Current rates are always on our pricing page.

How post-construction cleaning is priced

Most construction cleaning companies price one of three ways:

  • Per square foot. The most common method for contractors. It scales with the size of the job and makes bids easy to compare.
  • Flat price. Common for small homeowner jobs such as a single bathroom or a kitchen remodel, where square footage says little about the work.
  • Hourly. Sometimes used for small or unpredictable jobs. It is harder to compare and harder to budget.

We price contractor work per square foot by phase and homeowner remodels at a flat starting price. Splitting by phase matters because each visit is a different amount of work. A rough clean is mostly debris and heavy dust. A final clean details every surface. A touch-up only revisits the rooms where punch-list fixes happened.

Starting rates by phase

These are starting rates. Every bid is confirmed after we see plans, photos or the site.

Phase Commercial / tenant improvement Residential remodel or new home
Rough clean from $0.12 / sq ft from $0.15 / sq ft
Final clean from $0.25 / sq ft from $0.35 / sq ft
Touch-up and punch list from $0.08 / sq ft from $0.10 / sq ft
All three phases from $0.40 / sq ft from $0.55 / sq ft

There is a $750 minimum per project for contractor work.

Residential rates start higher than commercial because homes have more detail per square foot: more cabinets, more bathrooms, more trim and more glass in a smaller space. An open office floor has fewer surfaces per square foot to detail.

Commercial tenant improvement final clean: a cleaner scrubbing the concrete floor of a new office build-out

Homeowner remodel prices

If you are a homeowner cleaning up after your own remodel, a flat starting price is simpler:

Project Starting price
Single room or bathroom remodel from $350
Kitchen remodel from $450
Whole-home renovation from $0.45 / sq ft ($650 minimum)

The cleaning after a remodel page explains what is included.

Worked examples

These examples use our starting rates. They show how the math works; they are not quotes.

A 2,000 sq ft residential remodel, all three phases 2,000 sq ft × $0.55 = from $1,100

The same house, final clean only 2,000 sq ft × $0.35 = $700, which is under the project minimum, so the bid starts from $750

A 10,000 sq ft office tenant improvement, all three phases 10,000 sq ft × $0.40 = from $4,000

The same office, final clean and touch-up only 10,000 sq ft × ($0.25 + $0.08) = from $3,300

A homeowner's kitchen remodel Flat starting price from $450

If your project has a lot of glass, natural stone or difficult access, expect the bid to come in above these starting points. The next section explains why.

What raises or lowers the price

Six things move a post-construction cleaning bid more than anything else:

  1. Square footage and number of floors. More floors mean more stairs, more carrying and more setup time.
  2. Debris and dust left after the last trade. A site where trades cleaned up after themselves takes less time than one with offcuts, packaging and dried mud on every floor.
  3. Finishes that need special care. Natural stone, unlacquered brass, oiled wood and plaster each need specific products and more time.
  4. Glass. The number of windows, skylights, glass railings and shower enclosures. Glass shows every streak and takes longer than most surfaces.
  5. Access. Stairs, elevator bookings, parking and loading time. A three-flight walk-up in San Francisco and a hillside home in Marin with a long carry both take longer to set up than a ground-floor office.
  6. Timeline. After-hours or weekend work before an opening, or a compressed schedule before a walkthrough.

What usually lowers the price: booking all three phases together, a site that is broom-clean before the final clean, and a clear walkthrough date so the crew can be scheduled without rush.

Squeegee cleaning a wall of tall windows in a new Marin hillside home; glass, stone and access all affect the cleaning price

Why Bay Area prices run higher

Cleaning prices in the Bay Area are higher than in most of the country for the same reasons every trade costs more here: labor, parking, travel time between jobs and the age and type of the buildings. A Victorian flat with picture rails and original plaster takes more hand detail than a new tract home of the same size.

If you are comparing our rates with a national cost guide, compare like with like: the same phases, the same square footage, and the same scope, including whether inside cabinets and appliances are covered. National guides such as Angi and Fixr publish ranges you can use as a reference.

How to get an accurate bid

The more we know, the closer the bid will be to the final price. Send:

  • The address, so we can plan parking and access
  • Square footage and the number of floors
  • Which visits you need: rough, final, touch-up, or all three
  • Your walkthrough date
  • Plans or a finish schedule, if you have them
  • A few photos of the current state, especially glass, stone and anything unusual

We can bid from plans and photos. For large or unusual projects we walk the site before confirming.

Photographing a finished kitchen remodel next to the floor plan to send with a post-construction cleaning bid request

Questions about cost

Is post-construction cleaning more expensive than a deep clean? Usually, yes, per square foot. Construction dust is finer and spread wider than household dust, and a final clean covers the inside of every cabinet, drawer and appliance, plus window tracks and grout haze. A deep cleaning assumes a lived-in home without construction residue.

Do I need all three phases? Not always. Homeowners after a remodel often need only the final clean. Contractors on larger builds usually book all three, because a rough clean protects new finishes and a touch-up protects the walkthrough. Our post on rough clean vs final clean explains when each one is worth it.

Does the price include debris removal? Loose debris, scrap and packaging go to your on-site dumpster or bins. Heavy debris haul-off and dumpster service are not part of our cleaning scope.

How long is a bid valid? Ask when you receive it. Bids are based on the scope, finishes and schedule you send, so a change in any of them can change the price.

Get a bid

Request a bid with your address, square footage, the visits you need and your walkthrough date. We reply with a written bid by email. For contractors, the contractor page explains how we schedule around your walkthrough.

More guides

A newly remodeled bathroom with a spotless glass shower panel
A renovated sage-green craftsman bungalow in the East Bay hills
A new cedar and glass hillside home in Marin among the trees

Send us the job

The address, the square footage and your walkthrough date. We bid by email.