A post-construction cleaning checklist splits the work into three visits: a rough clean after drywall to clear debris and heavy dust, a final clean before the owner walkthrough that details every surface, and a touch-up after punch-list fixes. Below is the checklist we work from, room by room, so you can see exactly what each visit covers.
If you are booking for a project, the post-construction cleaning page explains the three phases and how we schedule them back from your walkthrough date.
What a post-construction clean covers
Construction dust is not ordinary household dust. Drywall sanding, cutting and grinding leave a fine powder that settles on every ledge, gets inside cabinets and drawers, and clings to new glass and stainless. A regular house cleaning moves that dust around. A post-construction clean removes it in a set order: top to bottom, dry before wet, and room by room so nothing is missed.
The checklist is split by phase because each visit has a different job:
| Phase | When it happens | Main job |
|---|---|---|
| Rough clean | After drywall, before paint, flooring and trim | Get debris and heavy dust out so finish trades start clean |
| Final clean | After all trades are done, before the walkthrough | Detail every surface the owner will see and touch |
| Touch-up and punch list | After punch-list repairs, before move-in | Re-clean the rooms where fixes happened and the high-traffic areas |
Before the crew arrives
A clean goes faster and better when the site is ready for it. Confirm these with the cleaning crew a few days ahead:
- Power and water are on, with working outlets on each floor.
- Lighting is good enough to see dust on glass and floors. Temporary lights help in rooms without fixtures.
- Trades are finished in the rooms being cleaned. A final clean done while an electrician is still trimming out fixtures will need to be partly redone.
- Dumpster or bins are on site for loose debris and packaging.
- Access and parking are planned. In San Francisco and other dense areas that can mean a loading zone, an elevator booking or protected hallways in a condo building.
- Special finishes are flagged: natural stone, unlacquered brass, oiled wood, coated glass. Each needs its own product.
Rough clean checklist
The rough clean happens mid-project. The goal is a clear, swept, dust-down space, not a polished one.
Debris
- Remove loose debris, offcuts, packaging and labels to the site dumpster
- Pull nails, screws and staples left on floors
- Bag drywall scraps and empty compound buckets
Dust
- HEPA vacuum floors, sills and ledges
- Vacuum open wall cavities and outlet boxes before they are closed or trimmed
- Knock down heavy dust from framing, beams and soffits
Floors
- Sweep and scrape floors, including dried mud and overspray spots
- Vacuum subfloor so new flooring goes down on a clean surface
Openings
- Wipe window frames, door frames and ledges
- Clean tracks of windows and sliders already installed
Hand-off
- Stage the space for the next trade
- Take a photo of each room for the project log
See the rough clean page for what this visit includes and what it does not.

Final clean checklist, room by room
The final clean is the one the client sees. Work top to bottom in every room so dust falls onto surfaces that have not been cleaned yet.
Every room
- High dusting: ceilings, beams, light fixtures, vents and fan blades
- Walls spot-dusted; scuffs and fingerprints wiped where the finish allows
- Baseboards, door frames, door tops and door hardware
- Switch plates and outlet covers
- Interior windows, sills and tracks; stickers and labels removed
- Closets: shelves, rods and floors
- Floors cleaned to the material: sealed wood, tile, stone, LVP; carpet vacuumed, edges and corners by hand
Kitchen
- Cabinets inside and out, including drawers and drawer tracks
- Appliances inside and out: oven, cooktop, refrigerator, dishwasher, microwave
- Range hood and filter
- Countertops and backsplash, including caulk lines and grout haze
- Sink, faucet and disposal flange
Bathrooms
- Tile and grout haze on walls and floors
- Glass shower enclosures and doors, including tracks
- Tubs, showers and drains
- Toilets, including the base and behind the tank
- Vanities inside and out
- Mirrors, fixtures and accessories
Living areas and bedrooms
- Built-ins and shelving
- Fireplace surround and hearth
- Stair treads, risers and railings
Before the walkthrough
- Walk every room with good light and look at it the way the owner will
- Take a room-by-room photo set for the contractor and owner
The final clean page has the full scope and how we schedule it, usually one to two days before the walkthrough.

Touch-up and punch-list checklist
Punch-list repairs create fresh dust: a re-caulked tub, a patched wall, an adjusted door. The touch-up clean goes back through only what was disturbed, plus the areas people walk through.
- Re-clean every room where punch-list work happened
- Floors and entries walked since the final clean
- Fingerprints on glass, stainless and new hardware
- Bathrooms and kitchen re-wiped for move-in
- A final photo set for the closeout file
This visit is short and is often booked the same week as the final clean. More on the touch-up and punch-list clean.
What is not on the checklist
A cleaning checklist covers cleaning. These items are usually separate and should be agreed in the bid:
- Haul-off of heavy debris and dumpster service
- Hazardous material removal
- Exterior window washing above the first floor
- Carpet shampooing or floor refinishing
- Repairs and paint touch-up
- Furniture setup
If you need any of them, say so when you ask for a bid so they are priced and scheduled up front.
Signing off the clean
A checklist only helps if someone checks it. Before the walkthrough:
- Walk it together. The site lead and the cleaning lead walk the space with the checklist and good light.
- Mark anything missed on the checklist or the punch list, with the room and the item.
- Photograph each room once it passes. The photos go to the contractor, who can forward them to the owner.
- Book the touch-up for after the last punch-list fix, not before.

Get a bid
We clean in three visits across San Francisco, the Peninsula, the South Bay, the East Bay and Marin. Contractor rates start from $0.40 per square foot for all three phases on commercial work and from $0.55 on residential, with a $750 project minimum. See pricing for each phase.
Request a bid with the address, square footage, the visits you need and your walkthrough date. You can send plans or photos instead of booking a site visit.






